top of page

Veolia

Veolia State Offices, Cambridge $7.5mil

Design and construction of Veolia Head Office, truck workshop, storage sheds, amenities block, employees carpark & 10,000m2 of concrete hardstand area for storage & maneuvering of 140 Veolia trucks.


Office block constructed of timber framework clad in colorbond with metal roof and internal office partition system.


Workshop constructed of concrete floor slab incorporating service access pits, precast tilt up walls, structural steel roof frame lined with metal roofing.


Storage sheds – concrete floor slabs, steel framework & metal roof & cladding.


Concrete hardstand – 150mm reinforced concrete hardstand over 150mm compacted FCR base to profiled subgrade.

Project Gallery